Case Studies
LOHARDAGA MATERIAL ROPEWAY
CRSPL has successfully completed the material handling Ropeway of approx 10 Km for transportation of bauxite involving Design, Engineering, Manufacturing, Supply, Civil & Structural, Fabrication, Erection,  Commissioning, Supervision, Performance & Guarantee Test for capacity augmentation of Ropeway from 41.64 TPH to 150 TPH at Hindalco,Mines Division,at Lohardaga.
Technical parameters
System  : Bicable Ropeway
Length of Ropeway  : 9.8(KM)(Approx)
Level difference between terminals  : 37(KM) (Approx)
Capacity of Ropeway  : 150 TPH (Max.)
HINDALCO INDUSTRIES LIMITED, RENUPOWER DIVISION, RENUSAGAR
CRSPL has successfully upgraded and commissioned 2 Nos. of 350 TPH Bi cable Ropeways intended for transportation of Coal for the power plant at Renusagar. The ropeway operates parallel to each other from the discharge location of Pipe conveyor to the Power Plant. CRSPL has also commissioned a coal handling plant of capacity 350 TPH.
Technical parameters
System  : Bicable Ropeway
Length of Ropeway  : 2500(M)(Approx)
Level difference between terminals  : 3 (M) (Approx)
Capacity of Ropeway  : 350 TPH(Max.)