Case Studies
LOHARDAGA MATERIAL ROPEWAY
CRSPL has successfully completed the material handling Ropeway of approx 10 Km for transportation of bauxite involving Design, Engineering, Manufacturing, Supply, Civil & Structural, Fabrication, Erection,  Commissioning, Supervision, Performance & Guarantee Test for capacity augmentation of Ropeway from 41.64 TPH to 150 TPH at Hindalco,Mines Division,at Lohardaga.
Technical parameters
System  : Bicable Ropeway
Length of Ropeway  : 9.8(KM)(Approx)
Level difference between terminals  : 37(KM) (Approx)
Capacity of Ropeway  : 150 TPH (Max.)