1971 : Indian Ropeway Engineering Company, Dhanbad
Design, supervision, erection and commissioning of a 75 Tonne Per Hour (TPH) capacity, 5.0 KM long Monocable Ropeway with Feeder Conveyor at East Nimcha Colliery.
1973 : Indian Ropeway Engineering Company, Dhanbad
Installation of a 200 TPH, 1.2 KM long automatic Bicable Ropeway with weighment facilities for transportation of ROM Coal at Sillewara Coal Mines.
1977 : Damodar Ropeways & Constructions Co. (DRCC)
Design and engineering, supply of critical items and necessary supervision for execution and commissioning of a 550 TPH capacity, 10 KM long fully automatic Bicable Ropeway for loading, transportation and discharge of seven grades of limestone and sand installed at Kalindi Project. The Ropeway was the then heaviest in the world.
1981 : Thermal Power Station for MSEB
Design and engineering, supply of critical items and necessary supervision for execution and commissioning of a 450 TPH capacity, 13.5 KM long fully automatic Bicable Ropeway including Storage & Handling Systems for transportation of coal between Kamptee Colliery and Koradi.
1982 : Macherla Cement Factory of KCP Ltd.
Design and engineering, supply of critical items and necessary supervision for execution and commissioning of 150 TPH capacity, 5.5 KM long Monocable Ropeway for storage, loading, transportation and selective discharge of crushed limestone.
1982 : PWD Irrigation, Madhya Pradesh
Design, supply and erection of a Cableway for gauging the river flow across river Sondur in Madhya Pradesh (now in Chhatisgarh).
1984 : Cement Plant site for Malabar Cements Ltd.
Design, engineering and supply of proprietary items and necessary Supervision for execution and commissioning of 200 TPH capacity, 6.3 KM long Monocable Ropeway with Storage and Handling Systems for carrying crushed limestone.
1984 : Pipla Colliery for MSEB
Design and engineering, supply of critical items and necessary supervision for execution and commissioning of 100 TPH capacity, 4.0 KM long Monocable Ropeway with Storage, Handling and Discahrge Systems for transportation of coal from Patansaongi to Pipla Colliery.
1988 : Renusagar Power Co. Ltd. (RPCL)
Design and development of a Bicable Ropeway Carriage originally supplied by a Czechoslovakian Firm to improve performance and supply of the same.
1989 : Renusagar Power Co. Ltd. (RPCL)
Design, Supply and Installation of a 300 TPH capacity, 7.8 KM long, Detachable Grip type Monocable Ropeway including 2000 T Storage System for transportation of coal.
1989 : Bharat Coking Coal Ltd.
Design and supply of essential equipments and revamping of an existing Tramcar type Ropeway.
1996 : Diamond Cements
Design, supply of critical items, supervision and commissioning of a 300 TPH capacity, 3.2 KM long, Monocable Ropeway including associated Material Handling Plant at Damoh, M.P..
1996 : Indian Aluminum Co (INDALCO)
Automation and mechanization of an existing Ropeway System to reduce manpower.
1997 : Eastern Coalfields Ltd. (ECL)
Design and implementation of a Revamping Work comprising of conversion of an Angle Station into Return Terminal Station with fresh Chain Haulage & Line Tripping Device on a Bicable Ropeway at J.K.Ropeways.
1998 : Eastern Coalfields Ltd. (ECL)
Revamping of a Monocable Ropeway by truncating the system, conversion of stations, dismantling and re-installation of equipment at new location.
1999 : INDALCO
Design, engineering, supply and installation of a system for Mechanization of Ropeway Unloading Station at Lohardaga, Jharkhand.
2008 : Gharibwal Cement Plant, Pakistan
Capacity Upgradation of a Material Ropeway from 230 TPH to 650 TPH along with supply of 6 nos. 650 TPH capacity Belt Conveyors of total length of 750 M at Gharibwal Cement Plant, Pakistan.
2016 : Material Feed and Reclaim arrangement for existing Ropeway at Lohardaga
Capacity augmentation of Ropeway from 41.64 TPH to 150 TPH, Material Feed and Reclaim arrangement for existing Ropeway at Lohardaga.