Projects Executed

List of Passenger Ropeway Projects Executed


Passenger Ropeway at Alaska Trams, Juneau, Alaska in 1987

Design and supply of Working Drawing of a prestigious project involving a Revolving Restaurant, a Hotel and a Passenger Ropeway on top of a Mountain in Alaska, USA.

Dongargarh Nagarpalika Parishad, Passenger Ropeway in 1994

Design, supply, erection and commissioning of a 150 PPH capacity, 700M long Monocable Jig Back Passenger Ropeway at Dongargarh.

Sahara India Housing Corpn. Ltd. in 1995

Design and installation of a 150 PPH capacity Monocable Jig Back Passenger Ropeway at Lake City, Lonavla.

WBFDC, Government of West Bengal in 1998

Revamping of an existing 100 PPD capacity Passenger Ropeway and converting it into 2000 PPD capacity, 2.3 KM long, Six-Seater, Monocable Continuous Rotating Gondola, taking full Operation & Maintenance control. A Joint Venture with West Bengal Forest Development Corporation Limited.

Ashoknagar Kalyangarh Municipality in 1999

Design and installation of a 100 PPH capacity, 140 M long, Monocable Jig Back Passenger Ropeway at Sanhati Park, Ashoknagar-Kalyangarh Municipality, District North 24 Parganas, West Bengal, on BOO basis.

THPA, Bhutan in 2001

Design and installation of a 1.6 KM long Monocable Jigback Ropeway for Transportation of Passenger and Material also to negotiate a steep hilly terrain, the steepest ever negotiated by a Ropeway, in India.

Municipal Corporation, Bhopal in 2001

Design, supply, erection, commissioning, operation and maintenance of a 200 PPH capacity, 430 M long Monocable Jigback Passenger Ropeway on "Build-Own-Operate-Transfer" (BOOT) basis, at Manuabhan Hill, Bhopal.

Passenger Ropeway at Kailash Giri, Visakhapatnam, Andhra Pradesh in 2004

Design and installation of a 800 PPH capacity, 350M long Monocable Continuous Rotating Passenger Ropeway at Kailash Giri, Visakhapatnam.

Passenger Ropeway at Kempty Falls, Mussoorie, Uttaranchal in 2005

Design and installation of a 400 PPH capacity, 127.5 M long Monocable Jig Back Passenger Ropeway at Kempty Falls, Mussoorie, Uttaranchal

Passenger Ropeway at Bheraghat, Marble Rocks, Jabalpur, Madhya Pradesh in 2007

Design, supply, erection, commissioning, operation and maintenance of a 400 PPH capacity, 600 M long Monocable Continuous Rotating Passenger Ropeway on BOOT basis, at Bheraghat, Marble Rocks, Jabalpur, M.P.

Passenger Ropeway at Karni Mata Mandir, Udaipur, Rajasthan in 2008

Design, supply, erection and commissioning of a 200 PPH capacity, 387 M long Monocable Jig Back Passenger Ropeway at Karni Mata Mandir, Udaipur, Rajasthan.

Passenger Ropeway at Salkanpur Temple, Madhya Pradesh in 2009

Design, supply, erection, commissioning, operation and maintenance of a 100 PPH capacity, 777 M long Monocable Jig Back Passenger Ropeway, at Salkanpur Temple, M.P.

Passenger Ropeway at Rangunia, Chittagong, Bangladesh in 2014

Design, Manufacturing, supply, erection Installation commissioning & Operation of a 400 PPH capacity (In built), 1190 M long Monocable Continuous Rotating Passenger Ropeway at Rangunia, Chittagong, Bangladesh.

Passenger Ropeway at Imagica, Khalapur, Raigad, Maharashtra in 2015

Design, Manufacturing, supply, erection and commissioning of a 500 PPH capacity, 218 M long Monocable Jig Back Passenger Ropeway at Imagica, Khalapur, Raigad, Maharashtra.

Passenger Ropeway at Tsomgo Lake, East Sikkim in 2017

Design, supply, erection, commissioning, operation and maintenance of a 800 PPH capacity, 625 M long, Monocable Continuous Rotating Passenger Ropeway at Tsomgo Lake, East Sikkim.


Back to Project Executed Main



Top