Techno Economic Study on installation of Ropeway between Auli and Parsano near Joshimath on the Garhwal Himalayas in 1977

Conducting Techno-Economic Survey and Feasibility Study on existing Goods Ropeway for conversion into a Passenger Ropeway in 1982

Techno-Commercial Report indicating solution for increasing capacity of the Darjeeling-Rangeet Valley Passenger Ropeway in 1984

Technical Feasibility Report for increasing the capacity of a Material Ropeway in 1984

Technical Feasibility Report on operational improvement of an existing Ropeway, Czechoslovak make in 1986

Report on the Financial Viability of Mount Juneau Aerial Tramcar in 1987

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Jaianbari and Tirthamukh in Tripura in 1991

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Chatlang & Durtlang in Mizoram in 1991

Techno-Economic Feasibility Study on installation of an Aerial Ropeways between Lawngtlai & Saiha in Mizoram in 1991

Ground Survey, selection of most suitable systems & alignment and Feasibility Study on Aerial Transportation System for Transportation of Lime Stone over a distance of 20 KM in 1992

Techno-Economic Feasibility Study and Selection of most suitable means of transportation of material from top of a hill to the Plant in 1993

Feasibility Study for Aerial Ropeway Transportation of Coal from Pench Valley Coalfields to Pench Thermal Power Station near Chindwara, MP in 1997

Feasibility Study for proposed Passenger Ropeway System to Samdruptse Hilltop at Namchi, Sikkim in 2000

Feasibility Study for a Passenger Ropeway from Bharalumukh to Kamakhya Hill, Guwahati in 2002

Techno-Feasibility Study for installation of a Passenger Ropeway between Deviguriya Hill and Ralamondal, Indore 2007

Techno-Economic Feasibility Study for installation of 650 TPH Material Ropeway between SIOM Mines and Yeshwant Nagar Railway Siding, Karnataka, for transport of Iron Ore in 2008

Techno-Economic Feasibility Study for installation of 500 TPH Material Ropeway between Mines and Stockyard near Ammasandra Railway Siding, Karnataka, for transport of Iron Ore in 2008

Techno-Economic Feasibility Study for installation of 650 TPH Material Ropeway between SIOM Mines and proposed ANKAMALAI Railway Siding, Karnataka, for transport of Iron Ore in 2008

Techno-Economic Feasibility Study for installation of a Passenger Ropeway at Munnar Hills, Kerala in 2008

Techno- Economic Feasibility Study for up gradation of existing Material Ropeway from 40 TPH to 150 TPH capacity in 2011

Techno- Economic Feasibility Study for installation of a Material Ropeway from Mines to Factory over a distance of 22 Kms in 2012

Technical Audit of Existing Passenger Ropeway, in Indonesia in 2012

Technical Audit of Existing Material Ropeway in 2012

Techno- Feasibility Study for installation of a Passenger Ropeway across Narmada River in 2012

Techno- Feasibility Study for installation of a Passenger Ropeway inside an amusement park in 2012

Technical Audit of the existing Material Ropeway and preparation of a suitable scheme for upgrading the system from 300 TPH to 450 TPH capacity from Mines to Factory in 2012

Techno- Economic Feasibility Study for installation of a Material Handling System from Mines to Railway Siding over a distance of 23 Kms in the state of Jharkhand in 2013

Techno- Feasibility Study for installation of a Passenger Ropeway at GIdda Pahar, Kurseong, West Bengal in 2014

Techno- Feasibility Study for installation of a Passenger Ropeway at Shri Sitaramji Veer Hanumanji Temple, Samod, Jaipur in 2014

Techno- Feasibility Study for installation of a Passenger Ropeway at Chamba, Himachal Pradesh in 2015

Consultancy Services for Preparation of Techno- Economic Feasibility Study Report for construction of 11 Nos. material Ropeways for Chanju - III HEP (48 MW) and Deothal Chanju HEP (30 MW) of HPPCL in Churah Tehsil of Chamba District, HP in 2016

Techno- Feasibility Study for installation of a Passenger Ropeway at Pathibhara, Nepal in 2016

Techno- Feasibility Study for installation of a Passenger Ropeway at Ranka, Sikkim in 2016

Techno- Feasibility Study for installation of a Passenger Ropeway between Chamunda Mata Temple and Hirni Mahadev, Rajasthan in 2016

Techno- Feasibility Study for installation of a Passenger in Bahrampur, west Beangal in 2017

Techno- Feasibility Study for installation of a Passenger Ropeway at Bandipur, Nepal in 2018